Skip to content

Guide topic

New builds and handover guides.

Guides to independent inspections during a new build, what to look at before handover and how to raise items with your builder.

Start here

The guide to read first.

Building & renovating

What are independent stage inspections for a new build and why have them?

Independent stage inspections are checks you commission at points during your new home's construction, such as slab, frame, lock-up, fixing and completion, so you have your own written record of the visible work. They are separate from the mandatory inspections carried out for the building permit and never replace them.

Published
Reading time
10 min read

New builds and handover

Every other guide in this topic.

  • Building & renovating

    What should buyers of a new estate home in Werribee check at handover?

    At handover of a new estate home in Werribee, check the finishes room by room, then what estates make important: drainage on reactive clay, downpipes connected to stormwater, fences and retaining walls, the driveway and crossover, and the builder's paperwork. An independent handover inspection lists what to raise with your builder and is separate from the building surveyor's final inspection.

    Published
    Reading time
    7 min read
  • Building & renovating

    What should I know about building a new home near Whittlesea?

    Building near Whittlesea can mean a lot in a new estate elsewhere in the municipality or a larger block around the township, where water supply, septic systems, access and bushfire related overlays may apply. Planning permits go through the City of Whittlesea and building permits through a building surveyor. Independent stage inspections sit beside the permit's mandatory inspections.

    Published
    Reading time
    7 min read
  • Building & renovating

    What should I know about building in a growth estate in Werribee?

    Building in a Werribee growth estate means a volume builder's program, Wyndham City Council and often the estate's own design guidelines, on land where soils in parts of Melbourne's west can be reactive clay. Plan for the permit's mandatory inspections, your own independent stage and handover checks, and the fences, retaining walls and drainage between new lots.

    Published
    Reading time
    7 min read
  • Building & renovating

    Should I do a handover inspection before or after making the final payment?

    Where your contract allows it, arrange the handover inspection before the final payment, once the home is finished enough to inspect and before you take possession. Unfinished or defective items then go to your builder while the contract's completion process is still open. Your contract sets the rules on completion and payment, so check it or ask a lawyer first.

    Published
    Reading time
    6 min read
  • Building & renovating

    What is a handover inspection and when should it happen?

    A handover inspection is an independent, visual check of a finished new home before you take possession, so you can raise unfinished or defective items with your builder. It should happen once the home is finished enough to inspect and before handover and the final payment, as your contract describes them. It is separate from the building surveyor's mandatory final inspection.

    Published
    Reading time
    7 min read
  • Building & renovating

    Should I inspect a volume builder home during construction?

    Many owners do: a volume build moves quickly, trades are often subcontracted, and each stage is covered up soon after it is finished. Independent stage inspections give you your own record of the visible work and items to raise with the builder. They are separate from the mandatory inspections for the building permit and do not replace them.

    Published
    Reading time
    7 min read
  • Building & renovating

    Which stages of a new build are worth an independent inspection?

    The stages most owners choose are the ones just before work is covered up: slab or base, frame, lock-up, fixing, and completion or handover. Which ones suit your build depends on your contract, your builder's program and what matters to you. These are independent inspections you commission; they never replace the mandatory inspections carried out for the building permit.

    Published
    Reading time
    8 min read

All guides

Still unsure?

Ask about your own situation.

If a guide did not cover your question, send an enquiry. We come back to you with the next step.

Call Now