In short

Building in a Werribee growth estate means a volume builder's program, Wyndham City Council and often the estate's own design guidelines, on land where soils in parts of Melbourne's west can be reactive clay. Plan for the permit's mandatory inspections, your own independent stage and handover checks, and the fences, retaining walls and drainage between new lots.

Published
Reviewed by
VicWide
Reading time
7 min read

Werribee sits in Melbourne's outer west, within Wyndham City Council, and it has two faces. The older town centre has established homes on established streets. Around it are large growth estates, where whole streets are at the same stage of construction and the site next door is a slab one month and a roofed frame the next. Much of the building work in Werribee happens on that second face.

This guide is for the people building there. It covers what makes an estate build different, the land and the soil, who approves what, the stages worth your own inspection, what happens at handover and around the boundaries, and the investment angle that applies to many Werribee builds. For the area in general, see our Werribee area page.

What makes a Werribee growth estate different from an established block?

On an established block in the older part of Werribee, you deal with one council, one builder and one set of neighbours who have been there for years. In a growth estate, several more parties shape the build.

The estate's developer often sets design guidelines that apply on top of the council's planning rules, covering things like external materials, colours, fencing, garages and landscaping. Those guidelines usually arrive with your contract of sale for the land, and your builder needs to design to them.

The builder is more likely to be a volume builder working to a standard plan and a tight program, with a site supervisor managing several homes in the same estate. That has advantages, and it means your home is one of many and the program moves whether or not you are there. Our guide on inspecting a volume builder home during construction explains how to work within that.

Everything around you is new too: roads, drainage, fences, the neighbours' slabs and the street trees. Boundaries between new lots are marked out by a land surveyor, and the retaining walls and fences that follow them are a shared question with whoever builds next door.

What do you need to know about the land and the soil?

Soils in parts of Melbourne's west are often reactive clay, which moves with moisture: swelling when wet, shrinking when dry. That movement is one common reason for cracking in homes, and it is the reason a soil test and a site classification usually sit at the start of a build.

The classification usually informs the engineer's design of the slab and footings. You do not need to understand the engineering, but know that it exists, is specific to your lot, and belongs in your records.

What you can do about reactive soil, as an owner, is mostly about water. Drainage that carries water away from the slab, downpipes connected to the stormwater system rather than discharging beside the house, and garden beds that do not keep one side of the home permanently wet all help to keep the moisture around the slab even. Those are questions to ask your builder before landscaping starts, and to keep in mind for years afterwards.

If you have not yet bought the lot, a land and property inspection looks at the land, site features and surrounds before you commit, including the fall of the block and how it sits relative to its neighbours.

Who approves what: Wyndham City Council, the building surveyor and the estate?

Permits and planning for Werribee go through Wyndham City Council. A planning permit, where one is needed, deals with how the land is used and developed; a building permit deals with the building work itself and is issued by a building surveyor, through the council or privately. Many estate lots have had the planning side settled at the subdivision stage, but that is for the council and your builder to confirm, not something to assume.

The building surveyor who issues your building permit also carries out, or arranges, the mandatory inspections for that permit at the stages the permit sets out. Those inspections belong to the permit process. They are not something you commission, and nothing you commission replaces them.

The estate's design guidelines are a third layer, administered by the developer rather than the council. They can affect the approval of your plans before the building permit is applied for, and what you do with the lot afterwards. Read them early and keep them with your contract.

Which stages are worth your own inspection on a Werribee build?

Alongside the permit's mandatory inspections, many owners in Werribee's estates arrange their own independent stage inspections, for their own information and their own record. Our guide on independent stage inspections for a new build explains what they are and how they differ from the surveyor's inspections. On an estate build, the stages that owners most often choose are:

  1. Slab or base, because on reactive soil the base is the part of the home owners most want a visible record of before it disappears under the frame.
  2. Frame, because the structure is fully open to view for a short window before the linings go on.
  3. Lock-up, when the roof, external walls, windows and doors are in and the weather is out.
  4. Fixing, when the internal fit-out can be seen before paint covers it.
  5. Completion, as the last stage or on its own as a handover inspection.

Each inspection is visual and covers what is accessible at that stage. The report describes what was observed, with photos and a note of what could not be seen, so you can raise items with your builder while they are simplest to deal with. Estate builds run to the builder's schedule, so tell us the stage date you have been given, even if it may shift.

What happens at handover, and what about fences, retaining walls and drainage?

At handover, buyers in Werribee's estates want someone independent to walk the new home with them and list the unfinished or defective items to put to the builder before they accept the keys. That is our handover inspection, and our guide on what happens at a handover inspection walks through the day.

It is separate from the building surveyor's final inspection for the permit, and it gives you a dated record of the home on the day you took it.

The boundaries deserve their own attention in a new estate, because they are often unfinished at handover. Fences between new lots are commonly a shared matter with the neighbour, and the estate guidelines may say what kind of fence is required.

Retaining walls appear wherever one lot is cut or filled relative to the next, and who builds and maintains them can depend on the levels, the contract and the guidelines. Drainage between lots matters most on reactive soil, where water pooling against a slab is the thing to avoid. Ask your builder what is included, ask the neighbour what they are planning, and check the guidelines before anything goes up.

What if the home is an investment, and how do you get started?

Many new homes in Werribee are bought as rentals from the start, and investors who live elsewhere gain most from an independent record of the build, because they see the site least. The same stage and handover reports serve them, and once the home is let, a dated condition report and clear rental inspections keep the record going. Investors also often ask for help arranging a depreciation schedule, a tax matter for an appropriately qualified person and your accountant.

To get started, send us the estate and lot number, the street name as your builder has it, the name of your builder, and the next construction stage or the handover date as your builder has it. Coverage of each address is confirmed with the enquiry. Send an enquiry through our contact page or call 0406 194 163, and we'll come back to you.

Sources and authorities

These public sources set out the requirements this guide refers to. They are the places to confirm what applies to your lot; we help you understand and prepare for them.

FAQs

Common questions.

Next step

Tell us about your property. We'll help with the next step.

Share what you need and where the property is. We come back to you to talk through scope and a quote before anything is arranged.

Call Now