Do I need a permit to subdivide my block?

In short

Usually, yes. Subdividing a block in Victoria is generally a planning matter through your council, often with a planning permit, and a licensed land surveyor prepares the plan of subdivision. Building work on the new lots needs its own permits from a building surveyor. Your council confirms what applies to your block; we help you understand and prepare.

Published
Reviewed by
VicWide
Reading time
7 min read

Subdividing a block means creating two or more lots, each with its own title, from land that currently sits on one. It is the step behind many dual occupancies, townhouse developments and backyard sales, and it raises a permit question that is a little different from the usual building ones. The short answer is that subdivision is generally a planning matter that goes through your council, and the building work that follows needs its own permits.

This guide explains what a subdivision involves, which permits and approvals are commonly part of it, who else is involved, why subdivisions stall and what to prepare. For the broader picture of planning permits and building permits, start with our guide to which permits you need for building work in Victoria.

What does subdividing a block actually involve?

A subdivision changes the title, not the ground. A licensed land surveyor prepares a plan of subdivision showing the new lots, any common property and any easements. Broadly, the council's planning process considers whether the subdivision fits the planning scheme, the plan is then certified, service authorities confirm their requirements, and the new lots come into existence once the plan is registered on the title. Your conveyancer or lawyer handles the title side and explains the steps that apply to your block.

Along the way, decisions are made about access, drainage, services, fencing and sometimes the removal or alteration of existing structures, and each of those can carry a permit of its own. That is why "do I need a permit to subdivide" usually has more than one answer.

Do you need a planning permit to subdivide?

In most cases, subdividing land in Victoria is a use and development matter under your council's planning scheme, and a planning permit is commonly required. The zoning of the block sets the starting point, and overlays, such as heritage, flood, bushfire, vegetation and others, can change what is permitted, add conditions or rule out a particular layout. The council may also look at lot sizes, access, car parking, drainage, open space and how the subdivision fits the neighbourhood.

Every block is different, and two blocks on the same street can carry different controls. The council confirms what applies to yours. Our permits and approvals service helps you understand what the council is likely to ask for and get your material in order; the decision, and the time it takes, sits with the council.

What about building permits?

The subdivision itself is generally not building work, so it does not usually come with a building permit of its own. The work that surrounds it often does. Demolishing an existing house or shed, building a second dwelling, constructing a new fence or retaining wall, altering a driveway or connecting services can each need a building permit from a building surveyor, and sometimes a planning permit as well. A project may need one, both or neither, and the council and the building surveyor confirm which applies.

Our guides to whether you need a permit to demolish a house and whether a granny flat or second dwelling needs a permit cover the two jobs most often tied to a subdivision. Boundary fencing between the new lots has its own questions, covered in our guide to whether you need a permit for a fence.

Any building permit comes with mandatory inspections carried out or arranged by the relevant building surveyor. Independent inspections you commission, for example a stage inspection on a new dwelling, are separate and do not replace them.

Who else is involved?

A subdivision is a team effort, and knowing who does what saves time.

  • A licensed land surveyor prepares the plan of subdivision and confirms the boundaries. Fences are not boundaries.
  • Your council runs the planning process and sets any conditions.
  • Service authorities for water, sewer, stormwater, power, gas and telecommunications usually have requirements for connections to each new lot, and may need to consent to the plan.
  • Your conveyancer or lawyer deals with the title, easements, covenants and any owners corporation that the plan creates.
  • A town planner or a lawyer may be needed for a complex application or an objection; we will say when that is the case.
  • A building surveyor issues the building permits for the work that follows.

If the new lots share a driveway, a wall or services, the plan may create common property and an owners corporation to manage it. That has consequences for every future owner, so ask your surveyor and your conveyancer about the options before the plan is drawn.

Why do subdivisions stall?

Most delays come from things that could have been found earlier. The common ones are:

  • An overlay that changes the layout, such as a flood, bushfire or vegetation control.
  • An easement for drainage or sewer running through the proposed building area.
  • A covenant on the title that restricts the number of dwellings or the type of building.
  • An existing house that would sit too close to the new boundary once the lot is drawn.
  • Access and crossovers that do not work for two lots, or that the council will not accept.
  • Drainage that cannot be resolved without works on the neighbour's side.
  • Unapproved structures that have to be dealt with before the council will proceed.

An independent land and property inspection records the visible features that feed into several of these: slope, retaining walls, drainage indicators, access and existing structures. Our guide to what to check about a block of land before buying applies equally to a block you already own and are thinking of splitting.

What should you prepare before you lodge?

Councils ask for different things, but a well organised owner usually has:

  • The title, the current plan and any covenants or easements noted on them.
  • A site plan or sketch of the proposed lots, access and services.
  • Details of any existing buildings and whether permits exist for them.
  • A note of the overlays and zoning the council has told you apply.
  • Any correspondence with the council, including a pre-application discussion if there was one.

Permits, plans and certificates for older homes are often incomplete, which slows things down when the council asks about an existing structure. Our documentation assistance service helps you work out what exists and what is missing before you lodge.

Where does VicWide fit, and where does it stop?

We help you understand which permits and approvals may apply to a subdivision, what the council and the other authorities are likely to ask for, how to organise your application material and how to make sense of any requests that come back. Where other people are involved, such as a surveyor, a designer or a consultant, we can help keep the process coordinated.

We do not decide anything. Every permit decision, and the time it takes, sits with your council, the relevant building surveyor or the relevant authority, and we cannot promise an approval, a condition or a timeframe. Building work should not start until the permits it needs are in place.

Tell us about your block and what you have in mind. Send an enquiry or call 0406 194 163 and we will help with the next step.

Sources and authorities

These public sources set out the requirements this guide refers to. They are the places to confirm what applies to your block; we help you understand and prepare for them.

  • Planning Victoria: planning permits, planning schemes, zones and overlays in Victoria, including subdivision.
  • Building and Plumbing Commission: Victoria's building regulator, with consumer guidance on building permits and what building surveyors do.
  • Your local council: the planning process, conditions and local requirements for subdividing land in its municipality.