Do I need a permit to demolish a house?
In short
Demolishing a house generally needs a building permit, issued by a building surveyor, and the council may also need to be involved, particularly where a heritage or other overlay applies. Services must be disconnected, materials that may contain asbestos identified first, and neighbouring properties considered. Your council and the building surveyor confirm what applies; we help you prepare.
- Published
- Reviewed by
- VicWide
- Reading time
- 6 min read
- Topic
- Permits and council
Does demolishing a house need a building permit?
In most cases, yes. Demolition is building work, and taking down a house generally needs a building permit issued by a building surveyor, who may work for your council or privately. The permit sets out the conditions for the demolition and the mandatory inspections that go with it, which the relevant building surveyor carries out or arranges. Any independent inspection you commission is separate and does not replace those.
The permit also tends to be where the practical conditions are checked: that services have been disconnected, that materials which may contain asbestos have been identified and handled by the right people, that the site will be made safe and secure, and that the neighbours' properties have been considered. Those steps are covered below.
Whether your demolition needs a permit, and what the permit requires, is confirmed by the building surveyor. Our guide to which permits apply to building work in Victoria explains how building permits and planning permits divide the work between the surveyor and the council.
When does the council need to be involved?
The council enters the picture in two ways. First, the council can have a role in consenting to demolition under the building rules, which the building surveyor will tell you about if it applies.
Second, and more significantly, the council decides planning matters. Where the block sits under a heritage overlay, demolishing or partly demolishing the house may need a planning permit, and the council may refuse it, approve it with conditions or ask for a different approach. Other overlays, such as vegetation controls affecting trees on the block, can also apply.
This is the step that catches people out, because the planning answer can take longer and carry more uncertainty than the building permit. Check your block with your council before you commission demolition quotes or new designs, and never rely on what applied to a neighbour's house. In suburbs such as Camberwell, where heritage overlays are common, this is often the slowest part of a demolition, and the same logic applies anywhere a heritage control exists.
Our permits and approvals service helps you understand which of these apply and what the council and the building surveyor are likely to ask for. Decisions, and the time they take, sit with them.
What has to happen before demolition starts?
Demolition is not a single event. A set of things happens first, and the permit process usually expects evidence of each.
- Services are disconnected or abolished by the providers and licensed trades: electricity, gas, water, sewer and telecommunications. Keep the confirmation from each.
- Materials that may contain asbestos are identified before anything is disturbed. Many homes built before about the start of the nineties may contain them, in sheeting, eaves, old wet areas, flooring and fences. Only testing of a sample confirms whether a material contains asbestos, and removal is a licensed activity carried out by others. Our asbestos inspection and testing service identifies materials that may contain asbestos and arranges sampling where it is needed.
- The site is secured, with fencing and signage as the permit and the demolition contractor require.
- Trees on the block are checked against any council controls before they are touched.
- Anything you want to keep, such as period fittings, is removed and stored first.
If the house is rented out, the rental agreement ends according to the current requirements, which your property manager or the relevant authority can explain. That is a separate process from the permit.
What about the neighbours?
Demolition shakes the ground, and the excavation and construction that follow can affect a neighbouring property. Where building work could affect a neighbour, a protection works process may be required, run through the building surveyor and the relevant authority's process, and it involves the neighbour directly.
Separately, many owners next door arrange a dilapidation report, a dated, photo-supported record of their property's visible condition before the works begin. If you are the one demolishing, offering to arrange one for the neighbours, with their agreement and with access arranged through them, is often the simplest way to keep the relationship calm.
The report records condition only; it does not decide what caused a later change or who is responsible. Those are matters for the parties, their insurers and, if needed, a lawyer.
What if you are demolishing to rebuild or subdivide?
Most demolitions are the first step in something else: a knockdown rebuild, a second dwelling or a subdivision. The permits for the demolition and the permits for what follows are separate, and it pays to understand the whole path before the house comes down. A planning decision on the new development can shape whether demolition is worth doing at all, so many owners seek that answer first.
Our guides to whether a granny flat or second dwelling needs a permit and whether you need a permit to subdivide a block cover the two most common next steps. If the project is an internal change rather than a full demolition, our guide to whether you need a permit to remove a wall inside your house is the better starting point.
For a rebuild, the new building permit will carry its own mandatory inspections, again carried out by or on behalf of the relevant building surveyor. Independent stage inspections you commission during the build are separate from those and do not replace them.
What do you prepare, and who confirms what?
Start with the block. Ask your council which overlays apply and whether demolition needs a planning permit. Then speak with a building surveyor about the building permit, its conditions and the inspections it requires. If an owners corporation is involved, for example with a unit in a group, add the owners corporation to the list.
Gather the title, any existing permits and certificates for the house, plans if you have them, previous reports, and anything you already know about materials that may contain asbestos. Our documentation assistance service helps you work out what you have and what is missing. Then describe the project, including what you plan to build afterwards and any deadlines you are working to.
We help you understand the likely requirements and organise the material so it is clear. Decisions on permits always sit with your council, the building surveyor or the relevant authority, and building work, including demolition, should not start until any permits it needs are in place.
Tell us about your property and your plans, and we will help with the next step. Call or message us on 0406 194 163, or send an enquiry and we will come back to you.
Sources and authorities
These public sources set out the requirements this guide refers to. They are the places to confirm what applies to your property; we help you understand and prepare for them.
- Building and Plumbing Commission: Victoria's building regulator, with guidance on building permits, building surveyors and protection of adjoining property.
- Planning Victoria: planning permits, planning schemes and overlays, including heritage overlays, in Victoria.
- Asbestos in Victoria: Victorian Government guidance on identifying and managing asbestos in homes.