Permits & documents
Do I need a permit for a granny flat or second dwelling?
In short
Usually, yes. A granny flat or second dwelling commonly needs a building permit from a building surveyor, and adding a second home to a block often raises planning questions with your council too. The zone, overlays, size and intended use decide what applies; the council and the surveyor confirm it, and we help you prepare.
- Published
- Reviewed by
- VicWide
- Reading time
- 8 min read
- Topic
- Permits and council
A second dwelling is a common project for owners to ask about, and one where the permit answer has many moving parts. A deck is a deck; a granny flat is a new home on a block that already has one, and both the planning system and the building system take an interest. The short answer is that a building permit is commonly needed, and a planning question usually comes with it.
This guide covers what counts as a second dwelling, the planning and building permit questions, conversions of existing structures, renting or selling the new dwelling, and what to prepare. Planning permits come from your council and deal with how land is used and developed; building permits come from a building surveyor and deal with the building work itself. Our pillar on which permits building work needs in Victoria explains the two systems; a second dwelling commonly touches both.
What counts as a granny flat or second dwelling?
"Granny flat" is an everyday name, not a planning term. People use it for anything from a self contained unit in the backyard to a converted garage, a relocatable cabin, or a wing added to the house with its own entrance and kitchen. What matters to your council and to a building surveyor is not the name but what the structure is and how it will be used.
Broadly, there is a difference between a room or studio that depends on the main house, a self contained unit for a family member, and a second home that could be let or sold separately. Each is assessed differently, so settle which of those you actually want before you talk to anyone, because the answer shapes everything that follows.
Does a second dwelling need a planning permit?
It often raises a planning question, because a second dwelling changes how the land is used. Whether a planning permit is actually required depends on the zone the block sits in, any overlays, the size and siting of the new dwelling, and whether it will be occupied by a dependant, let separately or sold on its own title later.
Some small second homes may be treated differently from a full second dwelling under the current planning rules, with conditions on size, siting and services that your council confirms. That does not mean every granny flat is exempt. Overlays such as heritage, flood, bushfire and vegetation controls can bring the council back in, and so can the size of the block or the dwelling.
Your council is the only reliable answer. Ask it, with a sketch of what you have in mind and where it would sit, before you spend money on drawings. Our permits and approvals service helps you describe the project clearly and understand what the council is likely to ask for. The decision is the council's.
Does a granny flat need a building permit?
In most cases, yes. A self contained dwelling is building work: footings, structure, waterproofing, fire separation, plumbing and drainage, and the other requirements a building surveyor assesses. Building permits are issued by a building surveyor, either through your council or privately, and a permit is commonly needed whether the dwelling is built on site, delivered as a prefabricated unit or created by converting an existing structure.
Where a building permit is issued, it sets out mandatory inspections at stages of the work, carried out by, or on behalf of, that building surveyor. Those inspections belong to the permit. Any independent inspection you commission, such as a stage inspection before work is covered up, is separate and does not replace them. If you plan to do the building work yourself, the owner-builder path has its own requirements, which you check with the Victorian building regulator.
What about converting a garage, a shed or a studio?
Many second dwellings start life as something else. A garage conversion keeps the walls but changes the use, which usually brings new requirements: natural light, ventilation and insulation for habitable rooms, waterproofing for any wet area, and often attention to the floor level or slab. A shed built as a shed was never assessed for people to live in. Whether the conversion needs a building permit is a question for a building surveyor, and the answer is commonly yes.
Our guides on carports and garages and on bathroom and kitchen renovations cover the two jobs that most often sit inside a conversion. Adding a second kitchen, in particular, can turn a renovation into a planning question, because a kitchen is one of the things a council looks at when it decides whether a space is a separate dwelling.
Older structures bring one more item. Many buildings put up before about 1990 may contain materials with asbestos, and a backyard garage or sleepout is a common place to find them. An asbestos inspection identifies the materials that may contain asbestos before anyone cuts into them, and only testing of a sample confirms what a material contains.
Can you rent out or sell the granny flat separately?
Renting and selling are different questions. Letting a second dwelling to someone outside the household can change how the council views it in planning terms, and a dwelling approved as a dependant's unit may carry a condition about who can live in it. Ask your council before you advertise it, and confirm with your conveyancer or lawyer what any existing permit allows.
Selling the second dwelling on its own title means subdividing the block, which is generally a planning matter through your council, with a licensed land surveyor preparing the plan of subdivision. A second dwelling built with a future subdivision in mind is designed differently from a dependant's unit, so say which you want from the start.
What else does the authority commonly ask about?
Beyond the permits themselves, a second dwelling raises practical points the council or the building surveyor commonly asks about:
- Services: how sewer, stormwater, water, power and gas reach the new dwelling, and whether the existing connections can take it.
- Access and parking: a path to the street, car parking where the planning scheme requires it, and whether a new crossover is needed.
- Setbacks and siting: distance from boundaries and the main house, overlooking and overshadowing, and open space for each dwelling.
- Easements: a sewer or drainage easement across the backyard can rule out the obvious position.
- Fire separation and protection works: separation between the two dwellings and to the boundary affects materials and design, and where the build could affect a neighbouring property the building surveyor's process may require protection works.
These are the questions to answer before the drawings are final, because changing a design after lodgement is slower than getting it right first.
What should you prepare before you apply?
A well organised owner usually has:
- A short description of the dwelling: its size, the number of rooms, whether it has a kitchen and bathroom, and who will live in it.
- A site sketch showing where it would sit, the distances to boundaries and the main house, and where services and any easements run.
- The title and plan, with any covenants or easements noted on them.
- Existing permits, plans and certificates for the house and any structure you intend to convert.
- A note of the zone and overlays the council has told you apply, and any correspondence with the council so far.
Paperwork for older homes is often incomplete, and a missing permit for the garage you want to convert slows everything down. Our documentation assistance service helps you work out what exists and what is missing before you lodge.
We help you understand which permits may apply, what your council and the building surveyor are likely to ask for, and how to organise the application material and read any requests that come back. We do not decide anything: every permit decision, and the time it takes, sits with your council, the relevant building surveyor or the relevant authority, and no one can promise an approval or a timeframe. Building work should not start until the permits it needs are in place.
Tell us about your block and what you have in mind. Send an enquiry or call 0406 194 163 and we will help with the next step.
Sources and authorities
These public sources set out the requirements this guide refers to. They are the places to confirm what applies to your block; we help you understand and prepare for them.
- Planning Victoria: planning permits, planning schemes, zones and overlays in Victoria, including second dwellings.
- Building and Plumbing Commission: Victoria's building regulator, with consumer guidance on building permits, building surveyors and owner-builders.
- Your local council: the planning process and local requirements for a second dwelling on your block.
