It may be possible to apply for a building permit after the fact. Put the work to a building surveyor, who decides what is needed. That can include plans of the work as built, an engineer's assessment, opening up, changes to the work or sometimes removal. We help you prepare; the decision is the surveyor's and the council's.

Published
Reviewed by
VicWide
Reading time
8 min read

Finding out that a deck, a carport, a garage conversion or a whole extension has no permit on record is common, and it usually happens at an awkward time: when a home is being sold, when a new owner wants to renovate, or when a neighbour or an insurer asks. The question that follows is whether a permit can be obtained now. Often it may be possible, but the path runs through a building surveyor, who decides what the work needs, and sometimes through your council as well.

This guide explains how to confirm what is on record, how an application after the fact tends to work, what a building surveyor commonly asks to see, what can happen if the work cannot be brought into line, and how the question changes when you are buying or selling. It sits under our pillar on which permits building work needs in Victoria.

How do you find out whether the work really has no permit?

Start with the record rather than the assumption. Work can be missing from the paperwork for three different reasons: it was exempt and never needed a permit, a permit was issued and the documents were lost, or it was built without one. Each leads somewhere different, and only the last needs an application after the fact.

Your council usually holds records of the building permits issued for a property, and you can ask for a copy of what is on file. The vendor's statement in a sale may list building permits issued in recent years. Old plans, certificates, council letters and even photographs of the work in progress help too. Our documentation assistance service helps you work out what exists, what is missing and what to ask the council for.

If the search suggests the work was exempt from a permit under the requirements of the time, say so with whatever evidence you have and ask a building surveyor to confirm. If a permit exists but the work does not match it, that is a different conversation, and the surveyor will want to see both.

Can you get a permit after the work is done?

Where the work genuinely needed a permit and did not have one, it may be possible to apply for a building permit now. A permit is not automatic. A building surveyor, either through your council or privately, assesses the work as it stands against the current requirements and decides what is needed before a permit can be issued. That can include an inspection of the work, opening up parts of it so the structure and the fixings can be seen, changes to bring it into line, or in some cases removal of all or part of it.

The council may also be involved. Where the work needed a planning permit, for example on a block with a heritage or other overlay, the planning question has to be answered as well, and councils have their own processes for unpermitted work. Our permits and approvals service helps you understand which permits may apply and what the surveyor and the council are likely to ask for. We cannot predict the outcome, and no one can promise an approval.

One distinction matters here. The mandatory inspections for a building permit, including any inspection of existing work the surveyor requires, are carried out by, or on behalf of, that surveyor. An independent inspection you commission is separate and does not replace them, although it can help you understand what you are dealing with before you apply.

What does the building surveyor usually need to see?

Requirements vary with the work and the surveyor, but the material commonly asked for includes:

  • Drawings of the work as it stands, usually prepared by a building designer or draftsperson, showing what was built and where it sits on the block.
  • An assessment of the structure by an engineer, where the work carries load: a deck frame, a removed wall, a roof over a conversion.
  • Certificates for plumbing, electrical and gas work, which licensed trades issue, or new work by licensed trades where none exist.
  • Evidence of footings, framing and fixings, which may mean opening up linings, lifting decking boards or digging beside a post.
  • Details of materials and any products with their own requirements, such as glazing, waterproofing and fire separation.
  • A planning permit, or confirmation that none is needed, where the council's scheme applies.

Gathering this takes time, and it is where most of the effort of an application after the fact goes. If the structure is the worry, our structural inspection looks at visible cracking, movement and sagging and says plainly when an engineer is needed. It is not an engineering certification, and the surveyor decides what report they will accept.

What happens if the work cannot be brought into line?

Sometimes the work as built cannot meet the current requirements without changes. The surveyor may require alterations, from new bracing or footings to a changed stair or balustrade, before a permit can be issued. In other cases the only path is to remove part or all of the work. Councils and building surveyors also have formal tools for unpermitted work, including notices and orders that require an owner to act, and those carry their own deadlines and consequences.

We do not give legal advice. If you receive a notice or an order, or if a dispute with a builder or a previous owner is behind the unpermitted work, speak with a lawyer. We can inspect, describe what is visible and help you organise your material; the legal side is theirs.

What if you are buying or selling a home with unpermitted work?

For a buyer, the first sign is often an addition that looks newer than the house, a deck with no permit history, or a garage with a kitchen in it. An independent pre-purchase inspection describes the visible condition of the work and notes additions and alterations, but it cannot confirm whether a permit was obtained. Take the report to your conveyancer or lawyer, ask the agent for the permit history, and decide what the answer means for your offer. Our guide on whether a deck needs a permit covers the most common of these structures.

For a seller, unpermitted work tends to surface in the weeks before a sale. Gather the paperwork early, ask the council what is on record and talk to your conveyancer about what has to be disclosed. If you built the work yourself as an owner-builder, selling a home you built may bring other obligations, which you check with the Victorian building regulator. An independent building and pest inspection before you list gives you a dated description of what is there, so there are fewer surprises when the buyer's inspection happens.

How do you prepare, and how do we help?

A practical order is:

  1. Ask the council for the permit records for the property, and read the vendor's statement if there is one.
  2. Gather everything you hold: plans, certificates, old letters, photographs, invoices and the names of the trades involved.
  3. Have the work looked at independently, so you know its visible condition before the surveyor does.
  4. Approach a building surveyor, describe the work honestly and ask what they need before a permit can be considered.
  5. Engage a designer or draftsperson and, where needed, an engineer to prepare the material the surveyor asks for.
  6. Ask your council about any planning question at the same time, not afterwards.

Our guide on what help with a permit application actually involves describes those steps in more detail. We help you understand which permits may apply, what the building surveyor and the council are likely to ask for, how to organise the application material and how to read any requests that come back. The decision, and the time it takes, sits with the surveyor, the council or the relevant authority, and no one can promise an approval.

Tell us about the work and what you know of its history. Send an enquiry or call 0406 194 163 and we will help with the next step.

Sources and authorities

These public sources set out the requirements this guide refers to. They are the places to confirm what applies to your property; we help you understand and prepare for them.

  • Building and Plumbing Commission: Victoria's building regulator, with consumer guidance on building permits, building surveyors and building work carried out without a permit.
  • Planning Victoria: planning permits, planning schemes and overlays in Victoria.
  • Consumer Affairs Victoria: consumer guidance on buying and selling a home in Victoria, including the vendor's statement.

FAQs

Common questions.

Next step

Tell us about your property. We'll help with the next step.

Share what you need and where the property is. We come back to you to talk through scope and a quote before anything is arranged.

Call Now