What does help with a permit application actually involve?
In short
Help with a permit application means working out which permits may apply, identifying what the building surveyor or council commonly asks for, organising your plans and documents, checking for gaps before you lodge, and explaining requests from the authority in plain language. The decision always sits with the authority; we help you prepare for it.
- Published
- Reviewed by
- VicWide
- Reading time
- 7 min read
- Topic
- Permits and council
"We help with permit applications" is the kind of phrase that can mean almost anything, so it is fair to ask what it actually involves. The short version: we help you understand which permits may apply to your project, work out what the relevant authority will ask for, get that material organised and complete, and make sense of what comes back.
The decision itself, and the time it takes, always sits with your council, the relevant building surveyor or the relevant authority.
This guide walks through the help step by step, from the first conversation to the permit conditions you end up with. For the background on the two kinds of permit and who issues them, start with our pillar on which permits building work needs in Victoria.
What does "help with a permit application" mean?
Two permits come up in most residential projects. A planning permit generally deals with how land is used and developed, such as the siting, size or use of a building, and is administered by your council under its planning scheme. A building permit deals with the building work itself, such as its structure and safety, and is issued by a building surveyor, either through your council or privately. A project may need one, both or neither.
Help with an application is not a shortcut around either process. It is the work of understanding the process, preparing for it properly and staying organised while it runs.
Owners who have never done it before, people who have received a request for further information they do not understand, and buyers trying to work out the permit history of a property are the people this help is for. Our permits and approvals page sets out the service; this guide explains what happens inside it.
Step one: which permits may apply, and who decides?
It starts with a conversation about the project. We ask what you want to build or change, roughly how big it is, where it sits on the block, what is already there and whether you know of any overlays or restrictions on the title. From that we can explain which permits are likely to apply and why, and which questions still need an answer from the authority.
That last part matters. Whether a permit is needed depends on your project and your property, and the authority confirms it, not us. What we do is make sure you walk into that conversation knowing what to ask. For a project on the edge of a threshold, such as a retaining wall or a granny flat or second dwelling, that preparation is most of the value.
Step two: what will the authority ask for?
Each authority has its own list, and the list depends on the project, but applications commonly call for:
- Site plans, floor plans, elevations and sections, prepared by a draftsperson, architect or building designer.
- A copy of the title, with any restrictions recorded on it.
- Engineering design and computations, where the building surveyor requires them.
- Specialist reports where overlays or the site call for them, such as a soil report, an energy efficiency report, a heritage or arborist report, or a bushfire assessment.
- Details of the builder and the building contract, or the owner-builder arrangements if you are doing the work yourself.
- Existing permits, certificates and council correspondence for the property.
- A planning report or written response to the planning scheme for some planning applications.
We help you identify which of these are likely to apply, where each one comes from and who prepares it. If the property's paperwork is scattered, our documentation assistance service helps you work out what you have, what is missing and who might hold it, which is often the council, a previous owner or the building surveyor who issued an earlier permit.
Step three: how is the application organised, checked and lodged?
With the list in hand, the work is assembly. We help you gather the material into one organised set, check it for gaps and inconsistencies before you lodge, and coordinate with the designer, engineer or consultant where something is missing or does not match. A set of drawings that shows one thing while the engineering shows another is a common reason an application stalls, and it is avoidable.
How the application is lodged depends on the authority and on who is involved in your project. Many owners lodge through their designer or directly with the building surveyor or council in the way that authority asks. Tell us how you would like to work and we will confirm what we can do before anything is agreed.
Building work should not start until any permits it needs are in place. If work has already been done without a permit, there is a separate path, covered in our guide on getting a permit for work that was done without one. Demolition has its own permit questions too; see whether you need a permit to demolish a house.
Step four: what happens after you lodge?
Three things commonly happen next, and we help with each:
- A request for further information. The authority asks for something extra, or asks you to clarify something. We explain what is being asked, in plain language, and help assemble the answer.
- Notice and objections, for some planning applications. Some planning applications are advertised so neighbours can comment, and objections can follow. Understanding what that means for your application, and whether you need a town planner or legal advice, is part of the help; preparing a formal planning response may need a town planner, and we will say so.
- A permit with conditions. Permits are often issued with conditions, and some conditions need something done before work starts, during the build or before the building is occupied. We help you read the conditions so nothing is missed.
Once a building permit is issued, the building surveyor carries out, or arranges, the mandatory inspections for that permit at the stages it sets. Those statutory inspections are part of the permit process. Any independent inspection you commission from us during the build is separate, is for your own information, and does not replace them.
What do we not do?
It is as important to be clear about the edges:
- We do not decide whether a permit is needed, and we cannot promise an approval, a condition or a timeframe. Those sit with the authority.
- We do not prepare architectural drawings, engineering designs or specialist reports. We help you understand what is needed and coordinate the people who prepare them.
- We do not give legal advice or act as a town planner. For complex planning matters, objections or disputes, we will say when a town planner or a lawyer is needed.
- We do not carry out the mandatory inspections for a building permit. The relevant building surveyor does.
If you are unsure where to start, the FAQ answers the questions we hear most, and our pillar on which permits apply is a good next read. Tell us about your project. We will help with the next step: call or WhatsApp 0406 194 163, or send an enquiry and we will come back to you.
Sources and authorities
These public sources set out the requirements this guide refers to. They are the places to confirm what applies to your project; we help you understand and prepare for them.
- Building and Plumbing Commission: Victoria's building regulator: building permits, building surveyors, practitioner registration and owner-builder guidance.
- Planning Victoria: planning permits, planning schemes and overlays in Victoria.
- Your local council: planning permits and local requirements for your property.