A dilapidation report is a dated, photo supported record of your property's visible condition before the neighbour's demolition, excavation or building starts. If cracks or other changes appear later, you and the builder have a clear point of comparison. It does not decide cause or responsibility, and it is separate from any protection works process under the building permit.

Published
Reviewed by
VicWide
Reading time
6 min read

What is a dilapidation report and why does it matter when a neighbour builds?

A letter from next door, a planning notice on the fence or a skip bin in the driveway usually means the same thing: demolition, excavation or building is about to happen close to your boundary. Heavy machinery, digging near footings, vibration and changes to drainage can all affect a neighbouring home, and it is often hard to say afterwards whether a crack was there before.

A dilapidation report deals with that uncertainty. It is a dated, photo supported record of your property's visible condition before the nearby works begin: the walls, brickwork, render and roof areas that can be seen safely, the interior rooms with existing cracks, gaps and stains recorded by location, and the fences, retaining walls, paths, driveways and outbuildings, especially on the side closest to the works.

It describes visible condition only. It does not investigate the cause of existing cracks, and it cannot record what is hidden. Our guide to what a dilapidation report is and when you need one covers the general case; this guide is about the most common one, a neighbour's build.

How does the report protect you?

The protection is in the comparison. If a new crack appears above a doorway during the excavation next door, the report shows whether that doorway had a crack before, how long it was and what it looked like, with a dated photo. If a fence leans or a path drops after the works, the same applies. Without a record, the conversation becomes one person's memory against another's.

That matters in three situations. First, when you raise a concern with the builder or the neighbour, you can point to a specific entry and photo rather than a general worry. Second, if the matter goes to an insurer, a structural engineer or a lawyer, they have a dated baseline to work from.

Third, it protects the neighbour and the builder too, because a record of pre-existing cracks means they are not asked to answer for damage that was already there. Builders and developers often arrange one for exactly this reason.

What the report does not do is decide who is responsible. It does not prove that the works caused a change, and it does not settle a dispute. Those questions sit with the parties, their insurers and, where needed, a lawyer or the relevant tribunal.

What does the report record?

The scope is agreed with you before the inspection and focuses on the areas that matter for your situation. Typically it includes:

  • The exterior: walls, brickwork, render, cladding, eaves and roof areas that can be seen safely, with close-ups of existing cracks.
  • The interior: each room, with existing cracks, gaps, stains and other marks recorded by location.
  • Fences, retaining walls, paths, driveways, paving and outbuildings, especially on the side nearest the works.
  • Dated photos of each area, so each entry can be found and compared later.
  • A clear note of the areas that could not be accessed or seen.

You receive a dated written record organised by area, which you can keep and share with the other party, your insurer or your lawyer if you choose. It is a condition record, not a building inspection for defects and not a structural engineering assessment. If existing cracking looks like a structural concern, a structural check takes a closer look and says plainly when a structural engineer is needed.

What about protection works and the building permit?

Building work next door usually needs a building permit, issued by a building surveyor, and sometimes a planning permit from the council. Where the work could affect a neighbouring property, formal protection steps may apply through the building permit process and the relevant building surveyor, and you may receive paperwork about them. Read it carefully, keep it, and ask your lawyer about anything you do not understand; the pillar guide on which permits you need for building work in Victoria explains who issues what.

A dilapidation report you commission is a separate thing. It is an independent record for your own purposes. It does not replace the building surveyor's process, and the mandatory inspections for the neighbour's permit are statutory inspections carried out by, or on behalf of, the surveyor, not by you or us. If the builder's paperwork includes a dilapidation survey of your home, ask for a copy and check its scope; you can still have your own record made.

What happens if you notice damage later?

Compare what you see with the report and take your own dated photos straight away. Raise it with whoever is carrying out the works, in writing, pointing to the relevant entry in the report. Keep a simple log of dates, what you noticed and who you told.

If cracking is new, growing or comes with doors that stick or floors that have moved, treat it seriously. Our guide on what cracks in your walls mean and when to worry explains the common patterns, and the guide to when a structural inspection is needed covers the next step.

Where a dispute follows and an independent written report is needed for it, tell us about the matter first and we will confirm whether our dispute inspection service can help. For your rights and remedies, speak with a lawyer.

How do you arrange one?

Tell us the address, what the nearby works are and when they are expected to start, and share any paperwork you have received about them. Book before demolition or excavation begins, because the report records the condition on the day of the inspection. Arrange access to the rooms, outdoor areas and outbuildings in scope, especially on the side nearest the works, and point out any existing cracks or damage you already know about so they are recorded.

We confirm the scope and provide a quote before anything is booked. If you would like the property recorded again after the works finish, ask when you enquire and we will confirm whether it can be included. Investors sometimes combine the record with other structured reporting for a rental; our guide to compliance and reporting for a property explains those, and the cluster pillar on depreciation schedules for an investment property covers the tax records an investor keeps.

Works starting next door? Call 0406 194 163 or send an enquiry with the expected start date and we will come back to you.

Sources and authorities

These public sources set out the requirements this guide refers to. They are the places to confirm what applies to your property; we help you understand and prepare for them.