What should Box Hill owners near apartment construction know about dilapidation reports?

In short

If an apartment tower or townhouse development is about to start beside your Box Hill home, a dilapidation report gives you a dated, photo-supported record of your property's visible condition before demolition or excavation begins. It records condition only, does not decide the cause of a later change, and is separate from any protection works process through the building surveyor.

Published
Reviewed by
VicWide
Reading time
6 min read

Why do Box Hill neighbours ask about dilapidation reports?

Box Hill, in the City of Whitehorse, is a fast changing centre in Melbourne's east. Apartment towers now cluster around the central shopping and station precinct, and in the streets behind them, established brick homes, older units and newer townhouses sit beside one another. Knockdown rebuilds and subdivisions are common, and a large build on the next block is a normal part of owning a home here.

That is why owners near a new development ask us about dilapidation reports. Larger apartment projects often include basement car parks, which means excavation close to a boundary, and even a two or three townhouse development means demolition, machinery and months of vibration and traffic beside your fence.

A dilapidation report gives you a dated, photo-supported record of your property's visible condition before any of that begins, so that if something changes later, everyone is comparing against the same starting point.

Our Box Hill page sets out the mix of homes we are asked to look at in the suburb. For the general case anywhere in Melbourne, our guides to what a dilapidation report is and when you need one and how a dilapidation report protects you when a neighbour builds cover the basics. This guide is about what matters in Box Hill specifically.

What does a dilapidation report record on a Box Hill property?

The emphasis follows the works. For a home beside an apartment site, that usually means the side closest to the boundary gets the most attention: the external wall and its brickwork or render, the eaves and roof areas that can be seen safely, the fence, the driveway or path along that side, and any retaining wall or garden wall near the line.

Inside, we record existing cracks, gaps, stains and other visible marks room by room, with close-up photos so each one can be found again. Older Box Hill brick homes often already have hairline cracks over doorways, at cornices or in render, and recording them now is the point: a crack that is on the record cannot later be mistaken for a new one. Newer townhouses are recorded the same way, with attention to render, tiling and the junctions between materials.

Outside, the report covers paving, driveways, outbuildings and the pool or deck if you have one, as agreed in the scope. Areas that cannot be accessed or seen are noted as such. The report describes visible condition only; it does not investigate the cause of any crack and it cannot record what is hidden inside walls or below ground.

When should you arrange it?

Before the works begin, and ideally before any demolition or excavation on the site. In Box Hill the sequence is usually visible from the street: a planning notice goes up, the existing house is fenced off, demolition follows, and then the excavators arrive. The report is most useful when it is done before the first of those steps, because it then shows how your property looked before anything on the site changed.

If the works have already started, a report can still record the condition on that later date, and that is still worth having for the months ahead. It simply cannot show what the property looked like beforehand. If you have received paperwork about the development, from the developer, the builder or the City of Whitehorse, share it with us when you enquire, because the expected start date shapes the timing.

How does it sit with protection works and the developer's own report?

Two other things may happen around the same time, and they are easy to confuse with the report you commission. First, where building work could affect a neighbouring property, a protection works process may apply through the building permit and the relevant building surveyor. That process involves you as the neighbour, and the building surveyor and the relevant authority's process govern it. A dilapidation report you commission is a separate record and does not replace any of those steps.

Second, the developer or builder may arrange their own dilapidation report on your property, with your agreement and with access arranged through you. That is common in Box Hill because of the scale of the projects. You can agree to it, ask for a full copy, and still commission your own if you want a record whose scope you chose. Neither report decides anything on its own; both are points of comparison.

If the development is on a lot that shares a wall with yours, our guide for Brunswick terrace owners and shared walls covers the extra care that takes.

What happens if cracks appear during the build?

Compare what you see with the report and take your own dated photos as soon as you notice a change. Raise the concern in writing with whoever is carrying out the works, and keep copies. The report shows how the property looked beforehand; it does not prove what caused a later change or decide who is responsible. Those questions are for the parties, their insurers and, where needed, a structural engineer or a lawyer.

If cracking or movement looks like it could be a structural concern, a structural inspection is the closer look, and it says plainly when a structural engineer should assess it. For questions about your legal position, speak with a lawyer. We can record and describe; we do not negotiate or assess liability.

One more clarification, because the words are so similar: a dilapidation report has nothing to do with a depreciation report. If your Box Hill property is an investment, our guide to depreciation schedules for an investment property explains that separate, tax related document.

What should you tell us before we come?

Tell us the address and whether your home is a house, a unit or a townhouse, and where the development sits in relation to it. Describe the nearby works as far as you know them: what is planned, how close to the boundary, and when they are expected to start. Point out any existing cracks or damage you already know about, so they are recorded.

Arrange access to the rooms, outdoor areas and outbuildings in scope, especially on the side nearest the works, and let us know about anything that cannot be reached. If you are a builder or developer asking about neighbouring Box Hill properties, get each owner's agreement and arrange access with them first, then tell us which properties you would like recorded.

We confirm the scope and provide a quote before anything is arranged. Tell us about your property and the works next door, and we will help with the next step. Call or message us on 0406 194 163, or send an enquiry and we will come back to you.

Sources and authorities

These public sources set out the requirements this guide refers to. They are the places to confirm what applies to your property; we help you understand and prepare for them.

  • Building and Plumbing Commission: Victoria's building regulator, with guidance on building permits, building surveyors and protection of adjoining property.
  • Planning Victoria: planning permits and planning schemes in Victoria, including notice of nearby development.